N18121 Interior Progress Interior Side Panels Installed 5/7/19 Interior Side Panels Installed 5/7/19 Completion Wiring Of New Circuit Breaker Panel 4/18/19 Completion Wiring Of New Circuit Breaker Panel 4/18/19 Lavatory Bulkhead 3/18/19 Lavatory Bulkhead 3/18/19 Map Table Lamp 3/31/19 New PAX Control Panel and L/H Flight Deck Overhead Panel 3/31/19 Installing Reading Light Bulb Holders and Switches 3/31/19 Installing New Circuit Breaker Panel 3/31/19 R/H Heater Installation Complete 3/31/19 L/H Heater Installation Complete 3/31/19 L/H Heater Installation Complete 3/31/19 L/H Heater Installation Complete 3/31/19 Lower Sidewall Pattering 3/31/19 Lower Sidewall Pattering 3/31/19 Lower Sidewall Pattering 3/31/19 R/H Heater Installation Complete 3/31/19 Finishing Last Seat Hard-Point Installation 3/31/18 Completed table installation 3/22/19 Completed table installation 3/22/19 Window-line panel with window bezel 3/22/19 Window-line panel with window bezel 3/22/19 Freshly painted reading lights 3/22/19 New flight deck headset holders with Bose Lemo and USB Charging 3/22/19 Completed heater installation 3/22/19 Testing heater operation 3/22/19 Testing heater operation 3/22/19 Testing heater operation 3/22/19 Installing the last two sections of seat track 3/22/19 Test Fitting First Seat 3/11/19 Test Fitting First Seat 3/11/19 Installing Seat Track 3/11/19 Installing Seat Track 3/11/19 Test Fitting First Seat 3/11/19 Test Fitting First Seat 3/11/19 Test Fitting First Seat 3/11/19 Fitting Window Bezel 3/9/19 Fitting Window Bezel 3/9/19 Heater Mounting Components Ready for Primer 3/8/19 Honeycomb Sandwich Panel for Bulkheads 3/8/19 Heater Fuel Flow Filters and Shutoff Valves 3/8/19 Fist Table Mounted 3/8/19 Test Fitting Window-Line Panels 3/8/19 Test Fitting Window-Line Panels 3/8/19 Creating False Bulkhead Pattern 2/27/19 Creating Lavatory Bulkhead Pattern New Floor 2/21/19 New Floor 2/21/19 New Circuit Breaker Panel 2/13/19 New Circuit Breaker Panel 2/13/19 Seat Support Structure 2/13/19 Seat Support Structure 2/13/19 Seat Support Structure 2/13/19 Seat Support Structure 2/13/19 Seat Support Structure 2/13/19 Seat Support Structure 2/13/19 New Floor 2/13/19 New Main Electrical Feed 2/13/19 New Main Electrical Feed 2/13/19 New Main Electrical Feed 2/13/19 Heater Location 2/13/19 Heater Location 2/13/19 Heater 1/30/19 Heater 1/30/19 Heaters 1/30/19 Toilet 1/30/19 Toilet 1/30/19 Sub Floor Seat Support Position 3 1/30/19 Sub Floor Seat Support Position 4 1/30/19 Propellers Undergoing AD Corrosion Inspection 1/28/19 Galley Frame Test Fit 1/28/19 Floor Intercostal Seat Support Installation 1/28/19 Floor Intercostal Mount Pad 1/28/19 Floor Intercostal Mount Pad 1/28/19 Repaired Valence Duct 1/28/19 Main Generator Feed Wire Removed for Replacement 1/28/19 Cabin Seats 1/21/19 Valance and Heater Ducts 1/21/19 Main Aircraft Electrical 1/21/19 Valance Planning 1/15/19 Valance Repair 1/15/19 Valance Repair 1/15/19 Complete Bulkhead 1/5/19 Complete Bulkhead 1/5/19 Aft Cabin Bulkhead Door – 12/21/18 R/H Valance Duct – 12/21/18 Galley Drawing – 12/21/18 Galley and Lavatory Drawing – 12/21/18 New RH Heater Duct 11/14/18 New Baggage Bulkhead Getting Installed 11/14/18 New Lavatory Window 11/14/18 New Baggage Bulkhead Getting Installed 11/14/18 Seats from N855SA in Cal City 9/3/18 Share this:TwitterFacebookLike this:Like Loading...